Case Study 1 - Decking & Fencing

Carter's Carpentry were asked to transform an old patio area with a modern stylish decking area which looked over a 3 tiered garden. The area had to be prepared by knocking down a small retaining wall and even the old pond had to be cleared! After repairing the set of steps from level 2 to 3 with new slabs, we laid a deck frame approximately 7 meters X 6 meters to accommodate the new decking. #
Their stunning new feature was finished with decorative ballastrading around the edges.

Time taken: 5 Days

 
 
   
 

Case Study 1a - Decking & Fencing

Carter's Carpentry were asked to install a 7 x 3 metre decking area, erect new "feather edged" fencing, posts and full height gate, which had to be rotated to allow gate to be opened away from the new decking area to the rear. The Client asked us to create a safer garden environment for a boisterous 4 year old who had previously had to climb the 14" drop out of the rear entrance onto the paved area in the rear garden. It necessitated effectively a gentle graduation from the back entrance lawn area, avoiding the need for a step.

Time taken: 3 DAYS


 
 
 
 

Case Study 1b - Base Decking

Carter's Carpentry were asked to transform as old concrete shed base into a small deck base that could be used for a table with 4 chairs. From unsightly concrete base to stylish seating area!

Time taken: 1 day